Construction To Begin Soon On South Loop Data Center – the city’s 95th – Block Club Chicago

The facility will have a power supply of 20 megawatts and deliver up to 200 kilowatts per rack, using a hybrid liquid-and-air cooling system that operates on a closed loop, promising “scaleable usage."

SIGN UP HERE FOR FREE WIREPOINTS DAILY NEWSLETTER

Home Page Signup
First
Last
Check what you would like to receive:

FOLLOW US

 

WIREPOINTS ORIGINAL STORIES

WE’RE A NONPROFIT AND YOUR CONTRIBUTIONS ARE DEDUCTIBLE.

SEARCH ALL HISTORY

CONTACT / TERMS OF USE