Google announces carbon capture project with Broadwing Energy at Decatur’s ADM – WAND (Decatur)

Google said the new power plant with over 400 MW of generating capacity will be built on site. Google said the commercial operation should be up and running by early 2030, creating around 750 full-time jobs over the next four years.

SIGN UP HERE FOR FREE WIREPOINTS DAILY NEWSLETTER

Home Page Signup
First
Last
Check what you would like to receive:

FOLLOW US

 

WIREPOINTS ORIGINAL STORIES

Mark Glennon on AM560’s Morning Answer: Chicago pension buyout plan mostly shifts debt rather than eliminating it, property tax surge doubles inflation over three decades

Chicago’s political leadership is floating a pension buyout program as evidence it is seriously addressing the city’s thirty-six-billion-dollar unfunded pension liability, but Mark Glennon, founder of the Illinois policy research organization Wirepoints, said that the proposal moves debt from one column to another rather than reducing it, and that the broader fiscal picture facing the city continues to deteriorate across every measurable dimension. Audio here.

Read More »

WE’RE A NONPROFIT AND YOUR CONTRIBUTIONS ARE DEDUCTIBLE.

SEARCH ALL HISTORY

CONTACT / TERMS OF USE